2

New

Vintage

Hamm - Luxembourg

Breeam Very Good

Client

Composia

Projectmanager / Developer

Composia

Surface

13.950 m2

Our Role

MEP

Architect

iPlan Marc Gubbini

General contractor

Period

0-0

Status

Completed

Techniques

Electricity, Plumbing, HVAC

Lorem ipsum

About the Project

This project integrates state-of-the-art lighting, ventilation and air conditioning technologies to provide optimal comfort for the occupants. Simulations of the thermodynamic behavior of the building were also performed for this project to ensure the comfort of the future occupants and to estimate the final energy consumption of the building. This new building meets the criteria of a passive building including a net heating consumption of 13 kWh/m²/ year < the 15 kWh/m² /year of the passive criterion. In order to optimize energy consumption for heat and cold production, the air conditioning of the various offices is provided by active reversible ceilings.

Download PDF

Your project is very important to us. Let’s talk about your challenges and ambitions.

Get in touch